| Di | Lu | Ma | Me | Je | Ve | Sa |
|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | ||
| 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 13 | 14 | 15 | 16 | 17 | 18 | 19 |
| 20 | 21 | 22 | 23 | 24 | 25 | 26 |
| 27 | 28 | 29 | 30 | 31 |
Depuis le 11-12-2007 :
9596 visiteurs
Depuis le début du mois :
635 visiteurs
Billets :
66 billets
TECHNIQUE
Scenic space :
- circular : 9 m, ( 30ft )
- height : . 8 m, ( 26ft )
. of the tight rope : 2,2m ( 7,3ft )
Total space (outdoor):
- left to right : 20 m, ( 66ft )
- front to bottom : 16 m, ( 53ft )
Hanging :
- inside (without portico) :
1 hang point for the climbing rope, minimum height 7m ( 23ft ). ;
500 kg ( 1102.3 lbs ) strength.
2 hang points for the tight-rope, minimum 14m ( 46ft ) between them ;
1,6 t ( 31.5cwts ) tensile strength.
the climbing rope must be above the tight rope ( 50cm, 20in, from a side or an another)
- outdoor (with portico ):
possibility to put stakes in the soil , 4cm (1,57in), 1,3m (4,3ft) depth ;
No pipe in the ground or get the detailed map of these.
preferably natural soil ( embankment...)
nearby public; limited harmful noises
Electricity:
- outdoor in day light : 220 V 10 A
- in auditorium, under big top, outdoor at night : 380 V 20 A/phase
Putting up:
- putting up duration : 4h if it's inside, 5h if it's outdoor
outdoor, absolutely the day before the performance ( at the very least)
- putting down duration : 1h if it's inside, 3h if it's outdoor
Publié par cistude à 13:07:39 dans Un Pan de Jour technique | Commentaires (0) | Permaliens
1|
Commentaires